150 MLD sewage Treatment Plant in V-Valley, Bangalore

Sr. No Particulars Details
  1 Client Name Bangalore Water Supply and Sewerage Board (Banglore)
  2 Population (In lacs) -
  3 Project Model (PPP    / PPP-      HAM/EPC/O&M) EPC + O&M
  4 Brief Scope Construction of new 150MLD STP Phase 2 in place of existing 180MLD STP spread over an area of 32 Hectares will utilize around 15 acres of land from the available 32 Hectares. Ensuring the continuous partial operation of existing 180MLD plant, during construction of the proposed 150MLD Phase 2.
Design, supply, installation, commissioning of 35MLD STP at Maheshtala and Lifting pumping stations (4 Nos) with Intersection and Diversion (7 Nos) and pipeline network.
  5  STP capacity in MLD 150 MLD
  6  Status (Under Construction / Completed) Under Construction